incógnita
Envíe su consulta hoy
Cotización rápida
Why Choose Honokage for Your Packaging Project
Choose a manufacturing partner around the pack you need to deliver. Honokage supports plastic container and custom product projects, with discussion of design, tooling, decoration and production requirements.

Connect the Design with the Production Requirements

A packaging project involves more than choosing an attractive container. The pack also needs to suit the product, lid, filling process and handling conditions.

Bring the drawing, sample or reference model to the discussion. Define what must stay the same and what can change, then review the mold option, decoration and sample plan together.

01

Packaging Design Built Around Your Product

Start with the product, target fill and how the customer will open, handle and store the pack. Review the shape and lid alongside the space available for artwork and required information.

  • Compare an available model with your key dimensions and functions.
  • Identify where custom tooling or structural changes may be needed.
  • Agree the drawing, artwork and sample approval references.

For IML packaging, review the label layout on the molded pack before approving the final appearance.

Diseño de empaque Honokage 3
Ambientalmente
02

Material Choices with Defined Requirements

A material or weight change should be reviewed against the function of the complete pack. Discuss the container, lid and label together, along with the destination market and expected disposal route.

  • Specify the proposed resin and any recycled-content requirement.
  • Evaluate material reduction against the agreed performance needs.
  • Support environmental claims with evidence for the actual pack and market.

Do not treat a resin name or a single-material description as proof that every local recycling system will accept the finished pack.

03

Manufacturing Controls for an Agreed Specification

Production hygiene, product inspection and packing controls should relate to the proposed product and order. Review the relevant requirements as part of supplier approval and sample evaluation.

  • Define the material, drawing and artwork revision.
  • Agree the inspection criteria and relevant records.
  • Confirm packing, identification and the handling of nonconforming results.

Ask for the documentation relevant to your project rather than relying on broad quality claims.

Scroll al inicio