Injection Molding Equipment
Injection molding equipment forms the container or component around the selected mold and material. For an IML project, label handling also needs to be coordinated with the molding operation.
- Review the product drawing, material and mold requirements together.
- Confirm the decoration arrangement for the selected container.
- Agree the sample references and inspection points before production.
Share the container and lid as a complete pack when both are required. Machine selection alone does not establish the performance of the finished pack.


Material Feeding and Preparation
Material feeding connects the approved resin and color specification with the molding process. The preparation arrangement should suit the material and production order.
- Confirm resin identification and the agreed color reference.
- Review feeding, dosing and any required drying steps.
- Keep material changes aligned with the approved specification.
State any restrictions on additives, recycled content or material substitutions when discussing the project.
Product Stacking and Packing Equipment
Packing arrangements connect production output with storage, transport and the buyer’s handling process. Review how the selected products will be stacked, bagged and packed into cartons.
- Agree the number of pieces or sets per pack and carton.
- Confirm how containers and lids will be identified and packed.
- Review protection against handling damage and the required carton markings.
Confirm which steps are automated for the proposed product. Equipment photographs do not establish the packing method for every order.


Mold Making and Measurement Equipment
Tooling turns the agreed product design into a mold that can be evaluated through trial production. Review the drawing, part interfaces and measurement references before committing to a new mold.
- Identify the dimensions and features that matter to fit and function.
- Compare the existing mold option with the need for new tooling.
- Agree the trial sample and measurement requirements.
For a custom project, send a drawing or sample and explain how the part will be used. Tooling cost, ownership and the development schedule should be agreed for the specific project.


